If you do not have access to the highlighted functions (below) in your selected responsibility, you will be stopped from uploading Bills of Materials.
Below is a list of the Bill of Materials Functions required to access the specified modes. If you cannot access these required functions, contact your system administrator.
Bill of Materials Mode
Function
System Function Name
User Function Name
Bills of Materials
BOM_BOMFDBOM
Bills of Material
Engineering Bill of Materials Mode
Function
System Function Name
User Function Name
Engineering Bills of Materials
ENG_BOMFDBOM
Engineering Bills of Materials
Asset BOM Mode
Function
System Function Name
User Function Name
Asset Bills
BOM_BOMFDBOM_ASSET
Bills of Material: Asset Number
Maintenance BOM Mode
Function
System Function Name
User Function Name
Maintenance Bills
BOM_BOMFDBOM_ACTIVITY
Bills of Material: Asset Activity
Rebuildable BOM Mode
Function
System Function Name
User Function Name
Rebuildable Bills
BOM_BOMFDBOM_REBUILDABLE
Bills of Material: Rebuildable
All data entered into the database will conform to the Oracle audit table standards, and will include created by, creation date, last updated date and last updated by.
Modifying a Signed Project
Digital Signatures
We now offer more security for our Wizards by having digital signatures automatically applied to all products. Each product is now more secure for you and provides better visibility for tracking issues with broken signatures.
Copying Worksheets
When copying a workbook from an older version of your Wizard, users may receive the following error due to the older version not having a signature:
Error: You have modified a signed project. You do not have the correct key to sign this project. The signature will be discarded. Do you want to save changes and discard the signature or cancel the save action.
To resolve:
1.If you do not want to track the digital signature, then simply select ‘save changes and discard signature’.
2.If you DO want to track the digital signature, then the user will be required to copy the originalworksheet(s) into a non-xlsm workbook (e.g. xlsx). Once done this can then be copied into the new Wizard.